Methodology
Model across CSA design, control inventories, self-assessment, validation and action tracking, consistent with IIA guidance.
Components
M; a; n; a; g; e; m; e; n; t; ; p; e; r; f; o; r; m; s; ; C; S; A; ; (; f; i; r; s; t; ; l; i; n; e; ); ;; ; s; e; c; o; n; d; ; l; i; n; e; ; f; a; c; i; l; i; t; a; t; e; s; ;; ; i; n; t; e; r; n; a; l; ; a; u; d; i; t; ; v; a; l; i; d; a; t; e; s; .
Governance
CSA programme designControl-inventory buildCSA-facilitation support
Maturity levels
L1
Foundational (0–40) — Ad-hoc, undocumented, reactive.
L2
Developing (41–60) — Framework emerging; pockets of practice.
L3
Established (61–80) — Documented, standardised, governed.
L4
Strategic (81–100) — Board-grade competitive differentiator.
Across the Internal Control ecosystem
Knowledge graph · 4 relations
operationalised by
integrates (inverse)
